Beacon project:
Casa Light
25017 Lonato del Garda, Other associated region, Italy
Contact Pietrobon, Marco
See www.passivehouse-database.org for more information
Timeline
Beacon Timeline | 2012 | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
General description
The purpose was to build social housing zero energy buildings with low cost of construction, maintenance, low energy bills and high thermal comfort during all the year.
Project type
New build
Project scale
individual building
Ownership type
social housing
Building type and size
multi family dwelling
Treated Floor Area according to PHPP
560m²
Energy efficiency and use of renewables
This is the first multy family passive house building in Italy. Also is the first social hosing passive house in Northern Italy.It was built with low economical effort and is very likely to be reproduced in all the Country. This building demonstrates that is possible to built passive houses with not much extra‐cost. Renewable energy systems are integrated on the roof with solar photovoltaic panels grid-connected which partially cover the electrical energy demand of the heat pumps installed. Interesting balconies structure and integrated movable external solar shading were installed. Decentralized mechanical ventilation systems with heat recovery is installed with a ventilation machine for each apartment while the distribution system to bring in fresh air from outdoor and out the exhaust air is put in place in the common spaces of the stairs. --> Project team: Angiolino Imperadori – Giovanni Ziletti – Sergio Rossi – Alessandro Ziletti
Passive house database
Find this project at www.passivehouse-database.org